No va a explotar nada.. lo peligroso es toda la radiactividad liberada
Han actualizado el status de los reactores y dicen que de momento siguen igual y estables:
Unit 1 (shut down at 2:48pm on March 11th)
- Reactor is shut down and reactor water level is stable.
- Offsite power is available.
- At 8:19am, there was an alarm indicating that one of the control rods was
not properly inserted, however, at 10:43am the alarm was spontaneously
called off. Other control rods has been confirmed that they are fully
inserted (reactor is in subcritical status) - Status of main steam isolation valve: closed
- Injection of water into the reactor is done by Make-up Water Condensate
System. - At 6:08pm, we announced the increase in reactor containment vessel
pressure, assumed to be due to leakage of reactor coolant. However, we
do not believe there is leakage of reactor coolant in the containment
vessel at this moment. - At 5:22am, the temperature of the suppression chamber exceeded 100
degrees. As the reactor pressure suppression function was lost, at 5:22am,
it was determined that a specific incident stipulated in article 15,
clause 1 has occurred. - We decided to prepare implementing measures to reduce the pressure of the
reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. This preparation
work started at around 9:43am and finished at 6:00pm. - Restoration work in reactor cooling function is in progress to achieve
reactor cold shutdown.
Unit 2 (shut down at 2:48pm on March 11th)
- Reactor is shut down and reactor water level is stable.
- Offsite power is available.
- Control rods are fully inserted (reactor is in subcritical status)
- Status of main steam isolation valve: closed
- Injection of water into the reactor is done by Make-up Water Condensate
System. - We do not believe there is leakage of reactor coolant in the containment
vessel. - At 5:32am, the temperature of the suppression chamber exceeded 100
degrees. As the reactor pressure suppression function was lost, at 5:32am,
it was determined that a specific incident stipulated in article 15,
clause 1 has occurred. - We decided to prepare implementing measures to reduce the pressure of the
reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. This preparation
work started at around 10:33am and finished at 10:58pm. - Restoration work in reactor cooling function is in progress to achieve
reactor cold shutdown.
Unit 3 (shut down at 2:48pm on March 11th)
- Reactor is shut down and reactor water level is stable.
- Offsite power is available.
- Control rods are fully inserted (reactor is in subcritical status)
- Status of main steam isolation valve: closed
- We do not believe there is leakage of reactor coolant in the containment
vessel. - We decided to prepare implementing measures to reduce the pressure of the
reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. The preparation
woke started at around 12:08pm and finished at 12:13pm. - Reactor cold shutdown at 12:15pm
Unit 4 (shut down at 2:48pm on March 11th)
- Reactor is shut down and reactor water level is stable.
- Offsite power is available.
- Control rods are fully inserted (reactor is in subcritical status)
- Status of main steam isolation valve: closed
- Injection of water into the reactor is done by Make-up Water Condensate
System. - We do not believe there is leakage of reactor coolant in the containment
vessel. - In order to cool down the reactor, injection of water into the reactor
had been done by the Reactor Core Isolation Cooling System, however, At
6:07am, the temperature of the suppression chamber exceeded 100 degrees.
As the reactor pressure suppression function was lost, at 6:07am, it was
determined that a specific incident stipulated in article 15, clause 1
has occurred. - We decided to prepare implementing measures to reduce the pressure of the
reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. The preparation
woke started at around 11:44am and finished at around 11:52am. - Restoration work in reactor cooling function is in progress to achieve
reactor cold shutdown.
Indication from monitoring posts installed at the site boundary did not
show any difference from ordinary level.
No radiation impact to the external environment has been confirmed. We will
continue to monitor in detail the possibility of radioactive material being
discharged from exhaust stack or discharge canal.[/i]
Algunos cuando vean que Japon no explota al completo en un gigante hongo nuclear, tiraran las palomitas defraudados.
JAJAJAJAJJAJAJAJAJAJAJAJAJ
"La central que está en problemas es del mismo tipo que la de Garoña, aquí en España".
JAJAJAJAJAJAJAJAJAJAJAJAJAJAJAJAJAJJAJAAJA
Las centrales nucleares y las bombas atómicas tienen un funcionamiento bien distinto...
T-1000 continua..
@Angelorz ... Te acuerdas si la BBC decía que había habido una explosión por contención de HIDROGENO en la central nuclear?
Respecto al tema apocaliptico tan de moda, decir que los desastres naturales siempre han existido, cuando no habia tv, o nose les daba tanta repercusion.
Y porque hace 6 años hubiera el de Indonesia no podemos pensar que la tierra se esta rebelando y que habra mas y peores (o si), pero por ejemplo en los 60 se chuparon tres en 6 años que cuidado..
Top
1960 05 22 - Chile - M 9.5
1964 03 28 - Prince William Sound, Alaska - M 9.2
2004 12 26 - Sumatra-Andaman Islands - M 9.1
1952 11 04 - Kamchatka - M 9.0
1868 08 13 - Arica, Peru (now Chile) - M 9.0
1700 01 26 - Cascadia Subduction Zone - M 9.0
2011 03 11 - Sendai, Japón - M 8.9 último
2010 02 27 - OFFSHORE MAULE, CHILE - M 8.8
1906 01 31 - Off the Coast of Esmeraldas, Ecuador - M 8.8
1965 02 04 - Rat Islands, Alaska - M 8.7
1755 11 01 - Lisbon, Portugal - M 8.7
1730 07 08 - Valparasio, Chile - M 8.7
2005 03 28 - Northern Sumatra, Indonesia - M 8.6
Por cierto lo de aqui no puede pasar, el de Lisboa en 1755 temblo toda españa de paso, en la wiki trae los daños causados y tsunamis a europa y africa y demas.
a partir de 10 Rem aumenta el riesgo por cancer pero la persona no sufre envenamiento por radiación , eso es apartir de 100 rads
O una de 2 , o se llevan la gente que ha superado lso 10 Rads o la cosa está jodida y en cierto tiempo se alcanza los 100 Rams , la cual produce envenamiento leve por radiación.
La dosis letal está en 1000 rads y la semiletal en 400 Rads
#4653 no, han dicho algo de la destrucción.
Por dios, no puedes comparar una bomba con un terremoto.
#4659 pues no me acuerdo, la verdad.
Lo que estaban diciendo del hidrógeno hace unas horas es que el vapor liberado en la central para aliviar la presión, que era en principio radiactivo, se combinaba con hidrógeno en 5 segundos y se volvía estable, por lo que la radiación de la zona se mantenía baja.
Se pone interesante la ser.
Que putos heroes los que esten dando alli su vida refrigerando como pueden
¿Si todo sigue "normal y estable" por qué siguen aumentando el radio de evacuación?
- Precaución y por protocolo de actuación.
- Nos la están metiendo doblado y no va tan bien como dicen.
#4666 la cuestión es.. ¿cómo mantienes estable una fusión si esta se produce cuando se descontrola la reacción?
Ahora que cada uno saque las conclusiones que quiera.
Siendo japon una de las mayores potencias tecnologicas del mundo no me creo que esten con las chapuzas que estan haciendo para refrigerar el reactor.
La cosa va a ir muy mal.
#4668 eyaculando dentro , bukkake power xDDDD
Refrigeran como pueden , lo que lleva ala conclusión que la cosa esta estable dentro de la gravedad de la situación.
#4669 así tendrán que estar en cuanto a infraestructuras y movilidad para tener que tirar del agua de la playa xD